SIEMENS/VDO DISASSEMBLY AND ASSEMBLY WORKCARD
TABLE OF CONTENTS:
1. Torquing and measurements:
2. Visual check-before start:
3. Piezo injector identification check:
4.Initial electrical test:
a) 4.1 high voltage insulation test
b) 4.2 piezo stack resistance test
c) 4.3 piezo stack capacitance test
5. Piezo injector cleaning:
6. Piezo injector testing:
7. Recommendation and repair:
a) 7.1 stage 1 repair
b) 7.2 stage 2 repair
c) 7.3 stage 3 repair
8. Disassemble:
a) 8.1 disassemble of internal parts and analysis
b) 8.2 cleaning of internal parts
9. Assemble nozzle change:
10. Assemble solenoid side:
a) 10.1 assembling solenoid and torquing
11. Piezo injector air gap adjustment:
12. Piezo injector final testing: